TABLE OF CONTENTS

 

EXECUTIVE SUMMARY

Introduction

Environmental Monitoring Works

Environmental Licenses and Permits

Environmental Mitigation Implementation Schedule

Key Information in the Reporting Quarter

Summary of Complaints and Prosecutions

1.   INTRODUCTION

Background

Project Organizations

Summary of EM&A Requirements

2.   AIR QUALITY

Monitoring Requirements

Monitoring Locations

Monitoring Parameters, Frequency and Duration

Monitoring Methodology and QA/QC Procedure

Results and Observations

3.   NOISE

Monitoring Requirements

Monitoring Locations

Monitoring Parameters, Frequency and Duration

Monitoring Methodology and QA/QC Procedures

Results and Observations

4.   ENVIRONMENTAL AUDIT

Site Audits

Review of Environmental Monitoring Procedures

Status of Environmental Licensing and Permitting

Waste Management Status

Implementation Status of Event Action Plans

Summary of Complaints and Prosecutions

5.   FUTURE KEY ISSUES

Key Issues for the Coming Months

Construction Program for the Coming Quarter

6.   CONCLUSIONS AND RECOMMENDATIONS

Conclusions

Recommendations for the coming reporting period:

 

 

 

LIST OF TABLES

 

Table I                         Summary Table for Non-compliance Recorded in the Reporting Quarter

Table II                       Summary Table for Key Information in the Reporting Quarter

Table 1.1                     Key Project Contacts

Table 2.1                     Locations for Air Quality Monitoring

Table 2.2                     Impact Dust Monitoring Parameters, Frequency and Duration

Table 3.1                     Locations for Noise Monitoring Stations

Table 3.2                     Noise Monitoring Parameters, Frequency and Duration

Table 4.1                     Summary of Environmental Licensing and Permit Status

Table 4.2a-c                Observations and Recommendations of Site Audits

 

 

LIST OF FIGURES

 

Figure 1   General Location Plan of the Project and Locations of Air Quality and Noise Monitoring Stations

Figure 2   ET’s Organization Chart

 

LIST OF APPENDICES

 

A     Action and Limit Levels for Air Quality and Noise

B     Summary of Exceedance

C     1-hour and 24-hour TSP Monitoring Graphical Presentations

D     Noise Monitoring Graphical Presentations

E      Summary of Amount of Waste Generated

F      Event Action Plans

G     Environmental Mitigation Implementation Schedule (EMIS)

H     Complaint Log

I       Construction Programme

 

 

ABBREVIATION AND ACRONYM

 

 

AL Levels                   Action and Limit Levels

DSD                           Drainage Services Department

E / ER                         Engineer/Engineer’s Representative

EIA                             Environmental Impact Assessment

EM&A                        Environmental Monitoring and Audit

EMIS                          Environmental Mitigation Implementation Schedule

EP                               Environmental Permit

EPD                            Environmental Protection Department

ET                               Environmental Team

HVS                           High Volume Sampler

IEC                             Independent Environmental Checker

RE                              Resident Engineer

RH                              Relative Humidity

QA/QC                       Quality Assurance / Quality Control

SLM                           Sound Level Meter

WMP                          Waste Management Plan

SCISTW                     Stonecutters Island Sewage Treatment Works

HATS Stage 2A          Harbour Area Treatment Scheme Stage 2A

SBJV                          Sun Fook Kong - Bestwise Joint Venture