TABLE OF CONTENTS
Introduction
Environmental
Monitoring Works
Environmental
Licenses and Permits
Environmental
Mitigation Implementation Schedule
Key
Information in the Reporting Quarter
Summary
of Complaints and Prosecutions
Background
Project
Organizations
Summary
of EM&A Requirements
Monitoring
Requirements
Monitoring
Locations
Monitoring
Parameters, Frequency and Duration
Monitoring
Methodology and QA/QC Procedure
Results
and Observations
Monitoring
Requirements
Monitoring
Locations
Monitoring
Parameters, Frequency and Duration
Monitoring
Methodology and QA/QC Procedures
Results
and Observations
Site
Audits
Review
of Environmental Monitoring Procedures
Status
of Environmental Licensing and Permitting
Waste
Management Status
Implementation
Status of Event Action Plans
Summary
of Complaints and Prosecutions
Key
Issues for the Coming Months
Construction
Program for the Coming Quarter
6. CONCLUSIONS
AND RECOMMENDATIONS
Conclusions
Recommendations
for the coming reporting period:
LIST
OF TABLES
Table I Summary Table for
Non-compliance Recorded in the Reporting Quarter
Table II Summary Table for Key
Information in the Reporting Quarter
Table 1.1 Key Project Contacts
Table 2.1 Locations for Air Quality
Monitoring
Table 2.2 Impact Dust Monitoring
Parameters, Frequency and Duration
Table 3.1 Locations for Noise
Monitoring Stations
Table 3.2 Noise Monitoring
Parameters, Frequency and Duration
Table 4.1 Summary of Environmental
Licensing and Permit Status
Table
4.2a-c Observations and
Recommendations of Site Audits
LIST
OF FIGURES
Figure 2 ET’s
Organization Chart
LIST
OF APPENDICES
A Action and Limit Levels for Air Quality and
Noise
C 1-hour
and 24-hour TSP Monitoring Graphical Presentations
D Noise
Monitoring Graphical Presentations
E Summary
of Amount of Waste Generated
G Environmental
Mitigation Implementation Schedule (EMIS)
ABBREVIATION
AND ACRONYM
AL Levels Action and Limit Levels
DSD Drainage
Services Department
E / ER Engineer/Engineer’s Representative
EIA Environmental
Impact Assessment
EM&A Environmental Monitoring and Audit
EMIS Environmental Mitigation Implementation
Schedule
EP Environmental
Permit
EPD Environmental
Protection Department
ET Environmental
Team
HVS High
Volume Sampler
IEC Independent
Environmental Checker
RE Resident
Engineer
RH Relative
Humidity
QA/QC Quality Assurance / Quality Control
SLM Sound
Level Meter
WMP Waste
Management Plan
SCISTW Stonecutters Island Sewage Treatment Works
HATS Stage 2A Harbour Area
Treatment Scheme Stage 2A
SBJV Sun Fook Kong - Bestwise
Joint Venture